Location:Home?>?detail
Location: Home > News Update > News Update
Construction of the Guangzhou-Heyuan High-speed Railway Baiyun Airport Section started
Source: Date:2024年01月28日

On December 26, 2023, China Railway(Guangzhou) Investment & Development, on behalf of CREC, was responsible for the general contracting construction, and the construction of Baiyun Airport T3 to Jiangcun West Section of Guangzhou-Heyuan High-speed Railway was started with the participation of China Railway No.2 Group, China Railway Major Bridge Engineering Group and China Railway Tunnel Group. The line is an integral part of the planned Guangzhou-Heyuan high-speed railway, located in Baiyun District, Guangzhou, starting from the third phase of the planning red line at the eastern end of Baiyun Airport and ending at Jiangcun West Line Station, with a total length of 15.67 km, a design speed of 160 km per hour (local speed limit), and a total construction period of 60 months. One Baiyun Airport Station and two line stations along the whole line. It is reported that the project is an important measure to help Guangzhou build a "hub city" and promote the implementation of the functional orientation of Guangzhou Baiyun Airport as an "international aviation hub leading the construction of world-class airport clusters in Guangdong, Hong Kong, and Macao and supporting the strategy of a strong civil aviation country". It takes 30 minutes for the airport to reach the central city, 1 hour to reach the Dawan District and 3 hours to cover the adjacent provincial capitals.

Print Close

XML 地图 | Sitemap 地图